North Myrtle Beach Connector Bridge Opens
Sep
01st
2009
Posted By: Rose Foggotte @ 9:33am In: Myrtle Beach UpdateA dedication ceremony September 3 will open the long awaited North Myrtle Beach connector bridge. The parkway will go from Main Street in NMB, cross US 17 and the Intracoastal Waterway, and link with SC 31 & SC 90. Started in 2005 the new road will reduce congestion on US 17 and travel time to SC31, the Carolina Bays Parkway.
Share this Post:
Comments have been closed for this post.
Please contact us if you have any questions or comments.


Trackbacks (0)
Comments (0)